Skip to the page content Skip to primary navigation Skip to the search form Skip to the audience-based navigation Skip to the site tools and log-in Information about website accessibility

Construction

Center for the Performing Arts AHU Controls Retrofit

The existing air handling units within the Center for the Performing Arts have antiquated HVAC controls that are failing. The current control system does not adequately control the temperature of the space resulting in constant operation of the equipment to try to meet space temperatures.

The controls retrofit will replace the existing controls with new digital controls, which will restore proper efficient operations within the facility.

Updated 5.21.2012