Initial Projects

The landscaping projects below have been designated as high priority, high impact projects that can be completed to enhance the overall aesthetics of the campus. Please reference the following map for locations of each project as they are numbered 1-7.

Project #1

Construction of flower beds in front of the large campus signs on the South and North side of 28th St. entrance to campus at University Ave. Flower beds will be constructed of brick and pre-cast concrete that will match the existing brickwork. Irrigation will be extended to the new flower beds from the nearest source. Removal of seven trees behind the electronic sign to help with the health of some of the larger trees. This will also open up some sunlight in order to get some ground cover to prevent some erosion.

Before

After

Project #2

Student Services landscape bed renovation on the North side of Lot 1 and on the South side of the circle drive. New rock planter beds will be installed and turf added to match the area North of DSC between Student Services Building.

Before

After

Project #3

Re-develop areas at Northeast corner of DSC/swimming pool entrance. Bradford Pear trees will be removed to increase safety of students and faculty during icy weather and help keep limbs from damaging windows at the DSC in that area. Removal will also help to get a suitable ground cover established in this area. Shrubs will be added in the existing landscape area under the office windows.

Before

After

Project #4

Renovate the landscape beds in front of Ross Hall. New soil will be brought in inside the existing sloped areas and new plants will be placed there and also in cut-outs in the brick walkways at the entrance of the building.

Before

After

Project #5

Sloped areas in front of Trojan grill will be re-sodded and irrigation modified to help stabilize the soil in this area.

Before

After

Project #6

Remove three dying Redbud trees and replace existing tree wells on the North side of Student Union B building. The eight tree wells will be filled with four new trees, and four new large landscape flower pots that will contain a mixture of annual and perennial flowers.

Before

After

Project #7

Remove overgrown and dying landscape shrubs on the Southwest corner of University Plaza. Add new plantings and shrubs around the newly constructed University Plaza sign at the corner of University Avenue and Asher Avenues.

Before

After